  Van Leer Flexibles


THE CHALLENGE
Van leer’s existing unload system required approximately 30 hours to unload one rail car resulting in delays with daily switching and increased labor cost.

THE RESOLVE
Dover designed and installed a rail unload system tailored to handle extended rail locations with an unload rate of 60,000 lbs. per hour.

THE PRODUCT
With a 3 to 4 hour unload time, rail cars can be switched and removed within an 8 hour shift eliminating labor overtime and potential rail car demurrage charges.